 Project Overview


 

Caen Hill Pound 43 Piling

 

Client:

 

British Waterways / May Gurney

 

Duration:

 

2 Weeks

 

Completion:

 

April 2010

Sector: Water

 

Project Value:

 

£0.03M

Project Location: 

Wiltshire

Caen Hill, Devizes

Description:

-----------------------------------------------------------------------------------------------

Caen Hill Pound 43 is located along a long flight of locks known as the 'Caen Hill Flight' on the Kennet and Avon canal.
Bank repair works were required in pound 43 of the Caen Hill Flight. The original wharf wall had collapsed below the water level rendering the existing bank above liable to collapse.
The proposed work was to construct a new sheet piled wall approximately 27 metres in length furnished with a hardwood timber fender finished flush with normal water level such that the piles were not visible in normal conditions. The propsoed line was a straight line of cantlivered 3m long sheet piles pulled from one end of the bank to the other.
However once on site it became obvious that this was not going to be achievable if the maximum gradient of 1 in 2 was to be maintained. Subsequently the pile line was moved out into the pound, longer 3.5m piles were installed, anchor piles and tie rods were installed and the line followed the existing waters edge.
The rear of the sheet piled wall required filling and a 6a material was used topped off with topsoil and seed.
The works were delivered on time, to budget and to a very satisfactory standard of workmanship.

-----------------------------------------------------------------------------------------------

Directions:

 



Generate Yahoo! driving directions to location

 

View on Map:



Find project location on map

 

Email to a Friend:



Forward details of this project by email

 

Project undertaken by Hills Contractors Limited.


Tel: 0121 568 7432

Fax: 0121 568 6394

Email: sales@hillscontractors.com

 

 










 Photo Gallery


Existing Bank & Collapsed Wall

[ 2010-04-14 ]

New Sheet Piling

[ 2010-04-14 ]

New Sheet Piling

[ 2010-04-14 ]

Structural Fill & New Hardwood Fender

[ 2010-04-14 ]

New Sheet Piled Wall & Hardwood Fender

[ 2010-04-14 ]

Structural Fill

[ 2010-04-14 ]

New Path Above Embankment

[ 2010-04-14 ]

Finished Sheet Piled Wall & Bank

[ 2010-04-14 ]








 

Hills Contractors Limited. 

Unit 12, Holland Industrial Park, Bentley Road South, Wednesbury, West Midlands. WS 10 8LN.


© Copyright 2010 Hills Contractors Limited. All rights reserved.